Marina Development

Marina Development

Buffalo City · Eastern Cape

Readiness R0 Concept0% on file

R0 to R10 — documentation only, not an investment score

  1. R0Concept

  2. 1

    R1Site Identified

  3. 2

    R2Site Verified

  4. 3

    R3Pre-Feasibility

  5. 4

    R4Approvals Underway

  6. 5

    R5Feasibility

  7. 6

    R6Commercially Validated

  8. 7

    R7Bankable

  9. 8

    R8Funding

  10. 9

    R9Financial Close

  11. 10

    R10Construction / Operational

VerifiedEvidence uploaded, awaiting verificationNext milestone

Marina Development · 29 steps across 6 processes · typical preparation 18–36 months

Next de-risking milestone

Concept → site verified

From R0 Concept to R2 Site Verified · project is at R0

Required work

  • •Location mapping
  • •Tenure screening opinion
  • •Inside-port or open-coast route
  • •DFFE screening report

Gates still to close for this milestone

  • !Location identified and mapped — Land / hydrographic surveyor (SAGC); coastal engineer
  • !Tenure of the water and land screened — Environmental / property attorney
  • !Inside-port or open-coast regulatory route decided — Ports / maritime attorney
  • !DFFE environmental screening report generated — EAP (EAPASA)

Programme

about 2–3 months

Preparation capital (this milestone)

Not yet stated

Legal and data fees

People to appoint

Coastal / property attorney · EAP · Surveyor

An investor is asked to fund this specific step — not the whole project. Development capital de-risks; construction capital builds.

29 needed · 0 in progress. Change a step on the right. Request a study when a professional has to do the work.

Marine site & coastal engineering

0 of 6 steps on file · 25% of the documentation score

Verified is set by InfraPlan after review

Evidence required

Water-area polygon and landward erven / farm portions with SG codes, high-water mark position, nearest port limits, estuary or river mouth, marine protected area boundaries, existing slipways / harbours, dated photographs

Authority / who signs it off

Chief Surveyor-General (cadastre); SANHO charts; DFFE (MPA boundaries); TNPA (port limits)

Where

CSG Property Viewer; SANHO nautical charts; DFFE marine protected area maps; TNPA port limits on the port legal framework page

Who to contact and how

Provincial Surveyor-General; SANHO (sanho.co.za); TNPA port manager's office

Professional needed

Land / hydrographic surveyor (SAGC); coastal engineer

Indicative duration

1–3 weeks

Responsible party

Developer / sponsor

Evidence vault · 0 documents

Owner

Owner role

Due

Note / current position

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

This score is documentation only. It records what is on file and verified — not whether the project is a good investment.

Next upload

SARS tax compliance (TCS PIN)

One file. The rest wait. Needed for this seat.

Project details

Click the map to pin the site, or draw the project area

Leaflet © OpenStreetMap

Pin the site or draw the area this project will sit on.

Files on this project

No files on your access level yet.

People on this process

The platform suggests who usually sits on each side. Attach them, then limit what they can see.

No one attached yet. Add a suggestion below.

Letters

Use a template, write on the system, then sign. Each signature records who signed and how.

No letters on your access level yet.

Manage

Municipality desk