Mining & Rock Crushing

Mining & Rock Crushing

Buffalo City · Eastern Cape

Readiness R0 Land Identified0% on file

R0 to R10 — documentation only, not an investment score

  1. R0Land Identified

  2. 1

    R1Geological Potential

  3. 2

    R2Rights Screening

  4. 3

    R3Prospecting Application / Rights Stage

  5. 4

    R4Exploration Active

  6. 5

    R5Exploration Results

  7. 6

    R6Mineral Resource Defined

  8. 7

    R7Pre-Feasibility

  9. 8

    R8Feasibility / Bankability

  10. 9

    R9Permitted / Development Ready

  11. 10

    R10Construction / Operating Asset

VerifiedEvidence uploaded, awaiting verificationNext milestone

Mining & Rock Crushing · 28 steps across 6 processes · typical preparation 12–48+ months

Next de-risking milestone

Land → screened prospect

From R0 Land Identified to R2 Rights Screening · project is at R0

Required work

  • •Cadastral verification
  • •CGS desktop geological screen
  • •DMPR mineral-right screen
  • •DFFE environmental screening report

Gates still to close for this milestone

  • !Property identified and cadastrally verified — Conveyancer; professional land surveyor (SAGC-registered)
  • !Desktop geological screening against CGS data — Geologist (SACNASP-registered Professional Natural Scientist)
  • !Mineral-right screening on the DMPR licensing system — Mining-law attorney for a title search where a third-party right exists
  • !Environmental screening report generated — EAP (EAPASA-registered)

Programme

about 1 months

Preparation capital (this milestone)

Not yet stated

Low — data fees and a geologist's desktop report

People to appoint

Geologist · Conveyancer · EAP

An investor is asked to fund this specific step — not the whole project. Development capital de-risks; construction capital builds.

28 needed · 0 in progress. Change a step on the right. Request a study when a professional has to do the work.

Mineral-right & legal

0 of 7 steps on file · 20% of the documentation score

Verified is set by InfraPlan after review

Evidence required

Farm name, number, portion, SG diagram / 21-digit SG code, hectares, GPS polygon, title deed or lease / PTO, community or traditional-authority resolution where applicable, dated site photographs

Authority / who signs it off

Chief Surveyor-General (cadastre); Deeds Office (DALRRD)

Where

CSG Property Viewer ArcGIS services (csggis.drdlr.gov.za) for farm portions, parent farms, leases and servitudes; DeedsWeb via a conveyancer

Who to contact and how

Provincial Surveyor-General office; conveyancing attorney for a deeds search

Professional needed

Conveyancer; professional land surveyor (SAGC-registered)

Indicative duration

Same day – 5 days

Responsible party

Land owner

Evidence vault · 0 documents

Owner

Owner role

Due

Note / current position

Verified is set by InfraPlan after review

Evidence required

Screenshot / report from the DMPR Mining Licensing System showing whether a prospecting right, mining right, mining permit, retention permit or application exists over the area; right holder, right number, commodity, area, grant date, expiry; date of verification

Authority / who signs it off

Department of Mineral and Petroleum Resources (DMPR)

Where

DMPR Mining Licensing System (Project Indwe) public map viewer and search / report; SAMRAD for legacy records

Who to contact and how

DMPR Regional Manager's office for the province (Mineral Regulation branch) to confirm status in writing

Professional needed

Mining-law attorney for a title search where a third-party right exists

Indicative duration

1–10 working days

Responsible party

Developer / sponsor

Evidence vault · 0 documents

Owner

Owner role

Due

Note / current position

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

Verified is set by InfraPlan after review

This score is documentation only. It records what is on file and verified — not whether the project is a good investment.

Next upload

SARS tax compliance (TCS PIN)

One file. The rest wait. Needed for this seat.

Project details

5 corners · 5168.2 ha

Leaflet © OpenStreetMap

Files on this project

No files on your access level yet.

People on this process

The platform suggests who usually sits on each side. Attach them, then limit what they can see.

No one attached yet. Add a suggestion below.

Letters

Use a template, write on the system, then sign. Each signature records who signed and how.

No letters on your access level yet.

Manage

Municipality desk